欧美精品一区二区三区蜜桃视频_欧美交换配乱吟粗大视频_国产综合av一区二区三区_国产免费视频观看ai_国产女主播一区二区_伊人亚洲精品

首頁 產(chǎn)品展示>John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)搖臂總成的安裝方法

John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)搖臂總成的安裝方法

John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)搖臂總成的安裝方法,John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)搖臂總成的安裝方法技術(shù)支持,John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)搖臂總成的安裝方法費(fèi)用,John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)搖臂總成的安裝方法服務(wù)中心,John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)搖臂總成的安裝方法價格規(guī)格資料查詢,John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)搖臂總成的安裝方法哪里有,John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)搖臂總成的安裝方法多少錢,John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)搖臂總成的安裝方法附近聯(lián)系電話,寧波日昕動力科技有限公司
產(chǎn)品咨詢

詳細(xì)描述

John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)搖臂總成的安裝方法

1. Install push rods in same location from which removed.NOTE: Valve stem tips are specially hardened; wear capsare not required.

IMPORTANT: Relieve tension on rocker arm adjustingscrew to avoid damaging rocker armshaft during installation.

2. Position rocker arm assembly on engine.

IMPORTANT: Oil supply hole in rocker arm shaftmust be positioned at the flywheel endof engine and facing downward whenrocker shaft is installed.

3. Lubricate all rocker arms with engine oil and makesure they move freely. Tighten rocker arm supportstuds in a criss-cross sequence to specifications.

Specification

Rocker Arm Support Studs—Torque ............................................................................. 60 N•m (44 lb-ft)

4. Adjust valve clearance. (See CHECK AND ADJUSTVALVE CLEARANCE earlier in this group.)

檢查和調(diào)整氣門間隙

IMPORTANT: Valve clearance MUST BE checked andadjusted with engine COLD.

1. Remove rocker arm cover and crankcase ventilatortube.

IMPORTANT: Visually inspect contact surfaces ofvalve tips, bridges and rocker arm wearpads. Check all parts for excessivewear, breakage, or cracks. Replaceparts that show visible damage.Rocker arms that exhibit excessivevalve clearance should be inspectedmore thoroughly to identify damagedparts.

Replace valves, seats, springs andretainers in pairs per cylinder if founddamaged. Also replace bridge if any ofthese parts are replaced.

2. Remove plastic plugs or cover plate from enginetiming/rotation hole (A) and timing pin hole (B).

NOTE: Some engines are equipped with flywheelhousings which do not allow use of an engineflywheel rotation tool. These engines with straightnose crankshafts may be rotated from front noseof engine, using JDG966 Crankshaft Front/RearRotation Adapter.

3. Using JDE83 or JDE81-1 Flywheel Turning Tool, rotateengine flywheel in running direction (clockwise viewedfrom front) until No. 1 cylinder is at TDC compressionstroke. Insert JDG1571 or JDE81-4 Timing Pin inflywheel.

If No. 1 cylinder rocker arms are loose, the engine is at

No. 1 TDC compression.

If No. 1 cylinder rocker arms are not loose, rotateengine one full revolution (360°) to No. 1 TDCcompression.

4. With engine lock-pinned at TDC of No. 1 piston’scompression stroke, check valve clearance to followingspecifications. (Use sequence for 4-cylinder or

6-cylinder engines as outlined on next page.)

Specification

Intake Valve Clearance Checking(Rocker Arm-to-Bridge) (Engine

Cold)—Clearance ................................ 0.31—0.38 mm (0.012—0.015 in.)Exhaust Valve ClearanceChecking (Rocker Arm-to-Bridge)

(Engine Cold)—Clearance................... 0.41—0.48 mm (0.016—0.019 in.)

5. If valves need adjusting, use the appropriate valveclearance adjustment procedure on the next page andadjust to specifications below. Loosen the jam nut (A)on rocker arm adjusting screw. Turn adjusting screw until feeler gauge slips with a slight drag. Hold the adjusting screw from turning with screwdriver and tighten jam nut to specifications. Recheck clearance again after tightening jam nut. Readjust clearance as necessary.

Specification

Intake Valve ClearanceAdjustment (RockerArm-to-Bridge) (Engine Cold)—

Clearance ................................................................... 0.36 mm (0.014 in.)

Exhaust Valve Clearance

Adjustment (RockerArm-to-Bridge) (Engine Cold)—

Clearance ................................................................... 0.46 mm (0.018 in.)

Rocker Arm Adjusting Screw Jam

Nut—Torque .................................................................... 27 N•m (20 lb-ft)

6. Install rocker arm cover and crankcase ventilator tube.

John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)4缸發(fā)動機(jī)的氣門調(diào)整方法

NOTE: Firing order is 1-3-4-2.

1. Using JDG1571 or JDE81-4 Timing Pin, lock No. 1piston at TDC compression stroke (B).

2. Adjust valve clearance on No. 1 and 3 exhaust valvesand No. 1 and 2 intake valves.

3. Turn crankshaft 360°. Lock No. 4 piston at TDCcompression stroke (C).

4. Adjust valve clearance on No. 2 and 4 exhaust valvesand No. 3 and 4 intake valves.

John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)6缸發(fā)動機(jī)的氣門調(diào)整方法

6-Cylinder Engine:

NOTE: Firing order is 1-5-3-6-2-4.

1. Using JDG1571 or JDE81-4 Timing Pin, lock No. 1piston at TDC compression stroke (B).

2. Adjust valve clearance on No. 1, 3 and 5 exhaustvalves and No. 1, 2, and 4 intake valves.

3. Turn crankshaft 360°. Lock No. 6 piston at TDCcompression stroke (C).

4. Adjust valve clearance on No. 2, 4 and 6 exhaustvalves and No. 3, 5, and 6 intake valves.

John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)氣門行程的測量方法

IMPORTANT: For a more accurate measurement,measure valve lift at 0.00 mm (0.00 in.)rocker arm-to-valve tip clearance andwith engine COLD.

NOTE: Measuring valve lift provides an indication of wearon camshaft lobes and camshaft followers or pushrods.

1. Remove rocker arm cover.

2. Using JDE81-1 or JDE83 Flywheel Turning Tool andJDG1571 or JDE81-4 Timing Pin inserted in flywheel,lock No. 1 piston at TDC compression stroke.

3. Set rocker arm-to-valve tip clearance to 0.00 mm (0.00in.) for:

· No. 1 and 3 exhaust and No. 1 and 2 intake valveson 4-cylinder engines.

· No. 1, 3, and 5 exhaust and No. 1, 2, and 4 intakevalves on 6-cylinder engines.

4. Place dial indicator tip on top of valve bridge. Preloadindicator tip and set dial at 0.0 mm (0.0 in.).

5. Remove timing pin from flywheel and manually rotateengine one full revolution (360°) in running directionusing appropriate flywheel turning tool.

6. Observe dial indicator reading as valve is moved to fullopen. Record maximum reading and comparewithspecifications given below.

Specification

Intake Valves—Lift 9.03—9.43 mm(0.356—0.371 in.)

Wear Limit .................................................................. 8.70 mm (0.343 in.)Exhaust Valves—Lift 9.32—9.72 mm(0.367—0.383 in.)

Wear Limit .................................................................. 9.00 mm (0.354 in.)

7. Follow same procedure for all remaining valves andrecord readings.

If valve lift on all valves is within specifications, adjustvalve lash to specified clearance. (See CHECK ANDADJUST VALVE CLEARANCE earlier in this group.)If valve lift on one or more valves is not withinspecification, remove and inspect entire valve train andcamshaft.

8. Rotate engine one full revolution (360°). Lock engineat:

· TDC No. 4 compression stroke for 4-cylinderengines.

· TDC No. 6 compression stroke for 6-cylinderengines.

9. Set rocker arm-to-valve tip clearance to 0.0 mm (0.0in.) for:

· No. 2 and 4 exhaust and No. 3 and 4 intake valveson 4-cylinder engines.

· No. 2, 4, and 6 exhaust and No. 3, 5, and 6 intakevalves on 6-cylinder engines.

10. Repeat steps 4—7.

免費(fèi)熱線
400-100-8969???15088860848
機(jī)組銷售
0574-26871589? 15267810868
配件銷售
0574-26886646? 15706865167
維修熱線
0574-26871569  18658287286
手機(jī)端
微信公眾號
在線客服
主站蜘蛛池模板: 国产亚洲真人做受在线观看 | 一级毛片视频在线 | 又大又粗又长的高潮视频 | 99视频精品全部免费免费观看 | 中文字幕av日韩精品一区二区 | 中文字幕97 | 99久久国产综合精品女同 | 成人国产精品秘在线观看免费 | 日本精品巨爆乳无码大乳巨 | 九一成人免费视频 | 久久国产人妻一区二区免费 | 精品在线一区二区 | 高清av网| 国产白嫩受无套呻吟 | 免费看a∨ | 国产成人免费观看视频 | 久久中文视频 | 欧美人与拘性视交 | 97久久精品午夜一区二区 | 成人av播放 | 中文字幕乱码一区av久久不卡 | 国产成人福利资源在线观看 | 日韩一区二区免费看 | 高清无码一区二区在线观看吞精 | 欧美精品高潮在线视频导航 | 黄色国产一级视频 | 久久无码人妻一区二区三区 | 亚洲国产精品女人久久久 | av一区久久| 国产精品视频免费一区二区 | 国产成人福利在线观看 | 国产精品99久久久精品无码 | 一区二区在线免费 | 欧美精品高潮在线视频导航 | 97久久人妻一区二区中文无码 | 国产精品第3页 | 中文字幕视频在线看5 | 亚洲人成久久婷婷精品五码 | 黄网站免费观看 | 高清日韩一区二区 | 久久强奷乱码老熟女 |